Take the site to the grid application

Ask the next question in the same project. Noda builds the financial model, sizes the battery, plans the grid application and drafts the landowner offer, starting from the work already there.

Example question: Estimate the solar yield of a 20 MW project at my selected site in Spain, using single-axis trackers.
Noda continuing a wind project in Vaslui, Romania, after its screening: the chat builds a 30 MW financial model and opens the chart of value and return against the offtake price

Ask the next question in the same project

Noda builds on the work already there: the site, the screening and every source behind it. In the example, the screening left a 24 to 36 MW option, so the next question was about money.

Noda AIVaslui Wind Farm Study
can u make a financial model of the recommended project size
Noda AI
Executed code 2 times, used 13 tools · 56s

Three sizes done. Now the sensitivities that matter — the CfD strike is the biggest driver.

make it an excel also i want to see the PPA price
Noda AI
Executed code 9 times, used 11 tools · 2m 31s

30 MW screening financial model: assumptions, offtake-price breakevens, sizes, annual and quarterly cash flows

Albesti_30MW_financial_model.xlsxanalysisWorkspace

NPV and IRR against offtake price, with the CfD clearing range marked

offtake_price_chart.pngimagesWorkspace

Done — the workbook is in your workspace, six sheets, and the price chart alongside it.

The offtake price is the whole answer

The model is at 30 MW (5 × 6 MW), the headline of the recommended 24–36 MW band, on the report's own assumptions. NPV is exactly linear in the contract price against a fixed cost base, so these breakevens are solved, not eyeballed:

What you needPrice
Break even on NPV€41.90 /MWh
8% IRR€47.48 /MWh
10% IRR€58.26 /MWh
12% IRR€68.69 /MWh
Break even with no post-contract revenue€61.46 /MWh
Levelised cost of energy at 7%€47.06 /MWh

At the base case of €75/MWh the project returns €20.95m NPV, 13.2% IRR, payback 2039-Q2.

Why that matters

Romania's third CfD round cleared wind at €59.95–74.90/MWh. Laying that band across this model, the site returns roughly 10.3% to 13.2% IRR — which is to say the auction price range brackets your return pretty tightly. If you win at the bottom of the range you're at a 10% project; at the top you're at 13%.

For context on the two instruments, since they're easy to conflate: a CfD is the state auction — a 15-year two-way strike administered through Transelectrica, which is what the €59.95–74.90 figures are. A PPA is a private contract with an offtaker. This model's "offtake price" works for either; the breakeven table above applies to whichever you sign.

The assumption I'd attack first

The model assumes €70/MWh flat merchant power for ten years after the CfD ends. That single line carries €12.4m of the €20.9m NPV — about 60%.

Every input has a source or is marked assumed. The 30% capacity factor is the low end of two wind models, and the closest comparable farm runs at 30.2%. The 2032 start and the 7% discount rate are marked assumed.

The weakest number is named. The workbook flags the EUR 70/MWh power price assumed after the contract ends. It carries EUR 12.4 m of the EUR 20.9 m NPV.

How Noda builds the financial model

Noda starts from the inputs already in the project, runs the cash-flow model as often as the question needs and records each step, failed tries included. The example: the 30 MW workbook and its breakeven prices.

28 steps, 3 minutes

  1. Start from the screening’s model.Same inputs, rerun at 24, 30 and 36 MW
  2. Set aside: Four price runs set aside.You asked for the price too.
  3. Run 30 MW at seven offtake prices.EUR 40 to 80/MWh; NPV moves in a straight line
  4. Solve the price for each return target.Plus a case with no sales after the contract
  5. Dead end: First go at the workbook.Code error. Wrote it again.
  6. Write the summary sheet.The result and the price for each return
  7. List every input with its source.18 inputs; the weakest one is flagged
  8. Dead end: Six sheets in one pass.A cell format was missing.
  9. Fix it and write all six sheets.Summary, inputs, prices, sizes, cash flows
  10. Read it back and draw the price chart.128 quarters; the NPV matches the run
  11. Put the workbook in your project.With the price chart beside it

Result. Break even on NPV at EUR 41.90/MWh; a 10% IRR needs EUR 58.26/MWh. At the EUR 75 base case, NPV EUR 20.9 m and IRR 13.2%. 30 MW at seven offtake prices, on the screening’s inputs, 1 Oct 2026.

A workbook your team can check

Ask for a cleaner version and Noda adds a dashboard and saves it as a new version, with every number kept.

Albesti 30 MW wind farmVaslui county, Romania   |   screening financial model   |   EUR real, quarterly, 7% discount   |   1 October 2026
Net present valueEUR 20.9 mInternal rate of return13.2%Payback2039-Q2

The project

Installed capacity30.0 MW (5 x 6.0 MW, 170 m rotor, 200 m tip)
Commercial operation2032-06-30
Operating life25 years
Energy yield78,840 MWh/yr at a 30% capacity factor
Total capexEUR 39.0 m (EUR 1.3 m/MW all in)
Offtake, first 15 yearsEUR 75/MWh = EUR 5.913 m per year

For comparison

CfD round 3 (Oct 2025) wind clearingEUR 59.95 - 74.90 /MWh
 implied IRR on this modelabout 10.3% to 13.2%
Merchant price assumed after the CfDEUR 70/MWh flat to retirement
 NPV that one assumption carriesEUR 12.4 m of the EUR 20.9 m total

The offtake price you need

HurdleEUR / MWhWhat it means
Break even on NPV41.90Below this the project destroys value
8% IRR47.48A floor a cautious lender would accept
10% IRR58.26Typical hurdle for this kind of project
12% IRR68.69Good. Needs clearing near the top of the auction
Break even with no post-contract revenue61.46If the merchant tail turns out to be worth nothing
Levelised cost of energy at 7%47.06Cost per MWh over 25 years
DashboardOfftake priceAssumptionsSizesAnnual cash flowQuarterly cash flow

Questions about development

Something else? Write to hello@noda.energy.

Yes, at screening level. In the recorded run, Noda reused the screening report's own assumptions and built a 30 MW wind model in Excel: three sizes, a sweep of the offtake price from 40 to 80 EUR/MWh, the breakeven prices and the cash flow by quarter. Every input sits on one sheet with its source. Debt and tax were left out, and Noda said so, because a lender will ask for both.

Yes, as a first estimate. For solar, Noda estimates annual output from the location, the system design and stated losses. For wind, it states the wind source and the capacity factor it uses. A bankable energy yield assessment comes later, from a specialist with site measurements.

Tell it what the battery is for: move solar output to the evening, cut peak import or back up a site. Noda compares power in MW and usable energy in MWh across sensible sizes, with losses, cycles and grid limits stated. It asks for a load or generation profile and for prices before it says anything about returns.

It plans it. Noda confirms which operator and route apply to your project, then lists the documents, fees, studies and deadlines from the operator's current sources, in order. You submit the application and talk to the operator, with the checklist in hand.

Yes. The map, the sites, the report, the model and the conversation stay in one project, so the next question starts from what is already there. In the recorded run, the financial model started from the cash-flow assumptions the screening report had used.

What should Noda work on next?

Ask in your own words. You can attach a PDF, KML, GeoJSON, CSV or Excel file.

Example question: Estimate the solar yield of a 20 MW project at my selected site in Spain, using single-axis trackers.

Have an account? Log in